Nuclear has highest investment risk; solar shows lowest, say US researchers

Nuclear power plants exceed construction budgets by an average of 102.5%, costing $1.56 billion more than planned, according to a study by Boston University’s Institute for Global Sustainability.

Nuclear has highest investment risk; solar shows lowest, say US researchers

You are not logged in

If you want to read more, join the  ENERGY-HUB club

Login

Try the monthly membership in the ENERGY-HUB club for free!

Related articles

Maryland and Maine seek to increase energy storage development

Maryland governor signs bills directing 800MW energy storage procurement.

Falling li-ion battery prices mirror solar photovoltaics trends: Is there a role for second-life batteries before recycling?

Lithium-ion batteries are everywhere, powering everything from consumer electronics to electric vehicles, residential PV storage s…

Japanese companies testing chalcopyrite solar panels

Japan-based startup PXP Corporation and JGC Japan Corporation, a unit of JGC Corporation, are collaborating on a 1 kW one-year pro…

GKN Aerospace Joins Airbus Lead ICEFlight Project to Advance Hydrogen-Powered Aviation

GKN Aerospace is one of the project partners in ICEFlight (Innovative Cryogenic Electric Flight), a project aiming to contribute t…

HYDGEN & Energy Research Institute @ NTU Partner to Advance Onsite H2 Production for Industrial Decarbonization

HYDGEN, a Singapore & Indian-based leader in hydrogen electrolyzer technology, has announced a new research collaboration with the…

ENERGY-HUB is a modern independent platformsharing news and analytic articles from the energy sector on a daily basis. Within our portfolio we monitor czech, slovak and foreign press releases.

89863
Number of published news
2092
Number of published events
1184
Number of published articles
ENERGY-HUB uses ČTK news (The Czech News Agency), the content is protected by copyright law.
Transcription, distribution, or other dissemination of the whole or of a part of the content is prohibited without prior consent.
Drtinova 557/10, 150 00 Praha 5, Česká republika